2014

  • Engineering activity and desinging tasks in TVK – framecontract
  • Gazoline pipline reactivison in Algyő – MOL Logistic
  • Design work for maintenance of the continuous workstate in MMBF Szőreg-1 UGS 2014
  • Nagykereki-Ny. field extension
  • Jászberény geotermal test design – MOL Nyrt. – CEGE Zrt.
  • Reconstruction of heating system in Zsana UGS
  • Reconstruction of heating system in Kardoskút Gasplant
  • Individual flare system establishment in Kardoskút Gasplant - Feasibility study
  • Design of skid-mounted portable separator
  • Decrease the volumen of hydrogen sulfide content in associated gases – R&D project
  • Thermodynamic sizing of hermetic wall conduit
  • Risk analizing of hazardous lightning protection in MFGT’s UGS
  • Tank farm vessels reconstruction designing work in MOL Danube Refinery

2013

  • Ásotthalom field extension
  • Nagykáta-Ny field extension
  • Gas kompressor installation in the well sites
  • Reconstruction of glicol regenerator units in Zsana UGS
  • Process modification in HHE Endrőd gasplant
  • Reconstruction of fire water system in Algyő main
  • gathering station
  • Technical due diligence MMBF Szőreg-1 UGS

2012

  • Nyírgyulaj – Győrtelek (DN300) transmission pipeline reconstruction
  • Production start up of Beru-6 oil well
  • Endrőd Gas Treating Facility and Stabilizer
  • Túrkeve-K-1 well modification
  • „0” stage gas compressor implementation
  • Hajdúszoboszló UGS – surge suppressor system level design
  • Production start up of Beru-6 gas well
  • Making P&ID diagrams to HAZOP study

2011

  • Kiskunhalas É field extension
  • Production start up of Beru-4
  • Okány field extension
  • Mogyoród field extension
  • HHE Portable gas collection system
  • Gas compressor installation in HHE Hajdúnánás Gas plant
  • Compressor reconstruction in Füzesgyarmat
  • HHE Déva-4 water injection
  • Design work for maintenance of the continuous work-state in MMBF Szőreg-1 2011
  • Entrance system and CCTV system installation in E-ON UGS

2010

  • Part designing activities in the Szőreg-1 Underground Gas Storage Plant project
  • Zsana UGS flare gas utilization
  • Algyő Alsópannon field extension
  • Gas compressor installation in HHE Déva-2 gathering station
  • Crude oil technology design in HHE Hajdúnánás
  • Novi Sad – Panchevo – Smederevo pipeline – basic planning
  • Production start up of HHE Gyoma-3/B gas well
  • Borota and Jánoshalma South field extension
  • Üllés turnout expansion
  • Kiskunhalas ÉNy field extension
  • Production start up of Örm-K-1 and RAG-Örm-2 gas wells
  • Designing of stabilization plant in HHE Hajdúnánás

2009

  • 2RDS Compressor installation in Kardoskút gas plant.
  • 4RDS Compressor reconstruction in Battonya.
  • Production start-up of HHE Déva Ny-1 gas well.
  • Production start-up of HHE Déva-8 gas well.
  • Furta-Mezősas fluid pipeline.
  • HHE Túrkeve gas field expansion.
  • Pressure boost in HHE Hajdúnánás gas plant.
  • Production start up of Komádi-18 oil well.
  • Periodic supervising and control system in local gathering stations.
  • Engineering activities - in build period - in Szőreg-1 underground gas storage project.

2008

  • Pressure boost in Zsana Underground Gas Storage.
  • EOR (Enhanced Oil Recovery) in Nagylengyel V-VI. block.
  • Developing of lift gas system in Mezősas field.
  • Ruzsa field expansion.
  • Ásotthalom-É turnout expansion.
  • Production start-up of Penészlek-104 gas well.
  • Gomba 6-7-8 wells - Gomba gathering station oil pipeline.
  • Recovery of heating system in Kardoskút Underground Gas Storage.
  • Production start-up of HHE Endrőd-1 gas well.
  • Production start-up of HHE Gyoma-2 gas well.
  • HHE Dévaványa field expansion.
  • Heating system reconstruction of Algyő main gathering station.
  • Produced-water injection HHE Déva-4.
  • Installation of K-7 electric power distributor station in Algyő gas plant.
  • Heating system reconstruction of Battonya and Mezőhegyes main gathering stations.
  • Compressor engine exchange in Endrőd gas plant.
  • Production start-up of Tura-5 oil well.

2007

  • Production start-up of Berettyóújfalu-1 gas well.
  • Production start-up of Püspökladány-4 oil well.
  • Szőreg-1 UGS facilities, field lines.
  • Production start-up of Zsana É-63, -66, -67 gas wells.
  • Production start-up of HHE Déva-2 gas well.
  • Heating reconstruction in Kardoskút Underground Gas Storage.
  • Mud-plant project (2000 m3 capacity) in Algyő.
  • Production start-up of HHE Déva-3 és 3/B. gas wells.
  • Gas injection into the Szőreg-1 field.
  • Production start-up of Gomba-4 oil well.
  • Heating reconstruction in Kardoskút gas plant and main gathering station.
  • Heating reconstruction of Füzesgyarmat main gathering station.
  • Production start-up of Pitvaros É-1 gas well.

2006

  • Capacity expansion of Csongrád-Dél-2 oil field.
  • Capacity expansion of Üllés TR-23 oil field.
  • Pilisvörösvár, Százhalombatta gas pipeline.
  • Production start-up of HHE Déva-1 gas well.
  • Reconstruction of technology and heating system in Tázlár.
  • Technical due diligence (E.ON Földgáz Storage, KÖGÁZ, DDGÁZ).
  • Real estate inventory of MOL
  • Expansion of Tóalmás Oil Field and neighboring areas.
  • Capacity expansion of Zsana Underground Gas Storage.
  • Reconstruction of Bajánsenye-Őriszentpéter gathering station.
  • Production start-up of Komádi-10 oil field.
  • Energetic reconstruction of heating system in Algyő, Szank and Kiskunhalas gathering stations.
  • Exchanging of the electric supply cables of the 6 kV distributor stations in Algyő.
  • Design work for maintenance of the continuous work-state in the establishment and permission procedures of Mol Rt. in the year of 2006.

PERMITTING PROCEDURES

Preliminary environmental impact study
  • Production start-up of Mórahalom gas field.
  • Production start-up of Pusztaföldvár-É-1 gas well.
  • Production start-up of Mezőtúr gas field.
  • Production start-up of Gomba-1 oil well.
  • Production start-up of Tóalmás D-4 oil well.
  • Production start-up of Nagykáta 3/B oil well.
  • Production start-up of Hosszúpályi gas field.
  • Production start-up of Tóalmás D-3 oil well.
  • Production start-up of Nagykáta-2 oil well.
  • Production start-up of Kengyel-É gas field.
  • Production start-up of Komádi-10 oil well.
  • Production start-up of Beru-1 gas well.
  • Production start-up of Püspökladány-4 oil well.
  • Production start-up of HHE Déva-2 gas well.
  • Production start-up of HHE Déva-5 gas well.
  • Mud plant project (2000 m3 capacity) in Algyő.
  • Gas injection into the Szőreg-1 field.
  • Production start-up of Gomba-4 oil well.
  • Production start-up of Pit-É-1 gas well.

Environmental permission
  • Production start-up of Hosszúpályi gas field.

Water authority permission
  • Permission procedures in Üllés gas plant.
  • Permission procedures in Algyő MOL "C" furnace plant.
  • Permission procedures in Algyő MOL gas plant.

A társaság története
History of our Company
The Petrolterv General Contracting & Designing Ltd. works as a private company since January of 1995.
Details
Szervezeti felépítés
Organizational structure
The managing director an oil engineer and economist, working at the company since 1980, is responsible for leading...